The factory was shut down for maintenance and workshop renovation from August 1st to September 30th, 2018.
The factory was shut down for maintenance from August 1st to September 30th, 2018, and the workshop was rebuilt to make the production site and production equipment more in line with new laws and regulations and FDA requirements. And install VOC special line gas detection device, install monitoring devices at all locations, to achieve environmental protection without dead ends, continue to adhere to environmental green enterprises.